Our partners
Lifting and transport specialist Heavydrive is presenting its glass installation robot. The 7-axis manipulator has been further developed and now offers even more stability and precision. Here are the details.
The ski museum at Holmenkollen in Oslo is a testament to the rich history of skiing. In order to equip the historic building with a modern glass facade, a demanding glass installation was required, which was preceded by precise planning. Under extreme weather conditions and time pressure, a team from Heavydrive then carried out the installation of 40 large, heavy glass elements.
The installation of the spherical-curved facade at the MOL Campus in Budapest called for special equipment. With their flexible glass mounting solutions, Heavydrive was able to provide exactly what was needed.
In the construction of high-rise buildings, structural ducts and facade glass often have to be installed under the ‘moving’ scaffolding structure and under building projections. This is often complex. We show which solutions are available to simplify such installations.
At the Fensterbau Frontale trade fair in Nuremberg from 19 to 22 March, people are the focus for Hegla and Hegla boraident. The companies will be presenting solutions at their booth that make work easier for employees, provide a high level of safety, and improve efficiency.
Heavydrive systems for glass and facade installation were in use for a year on a building project in Salt Lake City, Utah, sometimes under the harshest climatic and weather conditions. Find out here how the project was successfully completed with lifting technology from Germany.
euroTech’s new attachment module for telescopic loaders and loader cranes eT-Litocran700 combines the features of a telescopic loader with the fine control of a vacuum lifter. Here are the details on how it works.
The TGT Robby 2000, which can lift loads of up to 2000 kg, is a brand new addition to our product range. Equipped with a crane hook, it has a working height of approx. 7.5 metres and a horizontal reach of over 5 metres. With a flyjib it reaches a working height of over 8.4 metres. The TGT Robby 2000 is a pick and carry unit that does not require supports during installation.
For the construction site at Frankfurt Airport’s new Terminal 3, Heavydrive has been commissioned to provide the equipment to install the facade glass. To make sure that everything goes smoothly when it counts, the company has now performed a test run in Austria.
For the new office building of the Irish life insurance and pension company Irish Life in Dublin, Heavydrive took over the installation of the glass facade. Here are the details of the installation.
The manoeuvrable and versatile transport aids UPT 150 and UPT 250 have now received an upgrade. Here you can find out what the devices from Uplifter can now do even more.
Switchable glass for sciences building, battery maintenance for lifters, a glass wall for offices and solar facades for energy generation. Here are our top stories of the week:
Assembly equipment provider Heavydrive offers a special service in which all batteries of lifting systems and other assembly equipment are intensively tested in the company's own workshop before they go to the construction site. Here you can find out what is involved in this.
For a glass processor to have invested in lifting equipment would not, on the face of it, seem newsworthy. However, this purchase marks the 2.500th sale of an Easy-Lifter glass lifting machine for Glaston.